{"id":21061,"date":"2026-11-25T14:20:51","date_gmt":"2026-11-25T13:20:51","guid":{"rendered":"https:\/\/teamwire.eu\/en\/?p=21061"},"modified":"2026-11-25T15:02:04","modified_gmt":"2026-11-25T14:02:04","slug":"out-of-band-communication-costs","status":"publish","type":"post","link":"https:\/\/teamwire.eu\/en\/blog\/out-of-band-communication-costs\/","title":{"rendered":"The cost of out-of-band communication: Why the backup channel is cheaper than the next outage"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"21061\" class=\"elementor elementor-21061\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-44ccae0 e-flex e-con-boxed e-con e-parent\" data-id=\"44ccae0\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-167f4b6 elementor-widget elementor-widget-text-editor\" data-id=\"167f4b6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p>On Thursday, 12 November 2026, around midday US Eastern Time, the first Outlook mailboxes froze. What followed was one of the biggest outages in the history of Microsoft 365: Exchange Online, Teams, SharePoint, Copilot and Defender were all affected; according to Downdetector data cited by CNN, reports of the outage reached 74 countries within about an hour.<\/p><p>Services were not fully restored until the morning of 14 November. Microsoft attributed the disruption to a software bug that had already been introduced in July, reduced server capacity, and Teams traffic, which was redirected to the same gateway as Exchange Online \u2013 according to the company, it was not a <a class=\"wpil_keyword_link\" title=\"cyberattack\" href=\"https:\/\/teamwire.eu\/en\/blog\/cyberattack-how-teamwire-effectively-supports-you-in-times-of-crisis\/\" data-wpil-keyword-link=\"linked\" data-wpil-monitor-id=\"1256\">cyberattack<\/a>.<\/p><p>The Anderson Economic Group (AEG), an economic research institute based in Michigan, told CNN that productivity losses amounted up to around US$7 billion. AEG President Patrick Anderson estimated that around 26 million users suffered actual economic losses on Thursday and 51 million on Friday \u2013 and that the figure is likely to rise beyond this preliminary estimate.<\/p><p>The real question for you as a CISO, IT manager or managing director is not whether Microsoft will go down again. It is: how does your organisation coordinate when email, chat and video calls are all down at the same time? And what is the cost of not having an answer to that?<\/p><h2>How much does an hour of communication downtime really cost?<\/h2><p>Most organisations are unable to answer this question. In its 2024 Hourly Cost of Downtime survey, the market research firm ITIC found that six out of ten companies are unable to quantify their hourly downtime costs. We have therefore calculated the figure here transparently, using an official figure and disclosed assumptions.<\/p><p><strong>The basis:<\/strong> According to a press release from the German Federal Statistical Office (Destatis) dated 29 April 2026, employers in the manufacturing and service sectors paid an average of \u20ac45.00 per hour worked in 2025 \u2013 including non-wage labour costs, 3.6 per cent more than in the previous year (\u20ac43.50) and around 29 per cent above the EU average of \u20ac34.90.<\/p><p><strong>The assumption:<\/strong> Not every minute of work is tied to Teams or Outlook. According to our research, there is no robust study measuring the proportion of \u2018blocked\u2019 working time in the event of a communication failure. The Microsoft Work Trend Index 2023 provides a point of reference: according to this, employees spend 57 per cent of their time within Microsoft 365 applications on communication (meetings, email, chat). This is not the same as lost time \u2013 some tasks can be postponed, whilst others continue without coordination. We therefore make a conservative estimate of 50 per cent blocked productivity and also present a cautious scenario (30 per cent) and a more stringent scenario (60 per cent).<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-cb997b6 e-flex e-con-boxed e-con e-parent\" data-id=\"cb997b6\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-36397c2 elementor-widget elementor-widget-li-spacer\" data-id=\"36397c2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"li-spacer.default\">\n\t\t\t\t\t<div class=\"li-elementor-widget li-elementor-widget--li-spacer\">\n    <div class=\"li-spacer-inner\"><\/div>\n<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-307e38d elementor-widget elementor-widget-html\" data-id=\"307e38d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"html.default\">\n\t\t\t\t\t<!-- Teamwire Blog (EN) | Table 1: Model calculation, 100 employees | for the Elementor \"HTML\" widget -->\n<style>\n.tw-oob-t1-en{\n  \/* Teamwire design tokens (light) *\/\n  --color-text:#0D0D0D;\n  --color-text-secondary:#575755;\n  --color-text-inverse:#FDFCFB;\n  --color-fill-brand:#0061FE;\n  --color-surface:#FDFCFB;\n  --color-surface-blue-subtle:#E2EDFF;\n  --color-bg-secondary:#F7F6F3;\n  --color-border-tertiary:#E3E2DD;\n  --color-border-primary:rgba(0,0,0,.15);\n  --color-border-inverse:#FDFCFB;\n  --space-4:4px;--space-8:8px;--space-12:12px;--space-16:16px;--space-24:24px;\n  --radius-12:12px;\n  margin:0 0 var(--space-24);\n  font-family:\"Host Grotesk\",system-ui,sans-serif;\n  color:var(--color-text);\n}\n.tw-oob-t1-en .tw-oob-t1-en__scroll{\n  overflow-x:auto;\n  border:1px solid var(--color-border-tertiary);\n  border-radius:var(--radius-12);\n  background:var(--color-surface);\n}\n.tw-oob-t1-en table{\n  width:100%;margin:0;border:0;\n  table-layout:fixed;\n  border-collapse:separate;border-spacing:0;\n  background:transparent;\n}\n.tw-oob-t1-en caption{\n  position:absolute;width:1px;height:1px;overflow:hidden;clip:rect(0 0 0 0);white-space:nowrap;\n}\n.tw-oob-t1-en th,.tw-oob-t1-en td{\n  margin:0;border:0;background:transparent;\n  padding:var(--space-12) var(--space-16);\n  vertical-align:middle;\n}\n\/* Header row: Host\/body_3-semibold, centred *\/\n.tw-oob-t1-en thead th{\n  background:var(--color-fill-brand);\n  color:var(--color-text-inverse);\n  font-size:15px;line-height:20px;font-weight:600;letter-spacing:.01em;\n  text-align:center;\n}\n\/* Column 1: own background and divider; all columns equal width (25%) *\/\n.tw-oob-t1-en thead th:first-child{\n  width:25%;\n  border-right:1px solid var(--color-border-inverse);\n}\n.tw-oob-t1-en tbody th{\n  width:25%;\n  text-align:left;\n  background:var(--color-bg-secondary);\n  border-right:1px solid var(--color-border-primary);\n  font-size:15px;line-height:20px;font-weight:600;letter-spacing:.01em; \/* Host\/body_3-semibold *\/\n}\n.tw-oob-t1-en tbody th span{\n  display:block;margin-top:var(--space-4);\n  color:var(--color-text-secondary);\n  font-size:13px;line-height:18px;font-weight:400;letter-spacing:.02em; \/* Host\/small-regular *\/\n}\n\/* Values: Host\/body_2-regular, centred under the column headers *\/\n.tw-oob-t1-en tbody td{\n  text-align:center;white-space:nowrap;\n  font-size:16px;line-height:21px;font-weight:400;letter-spacing:.01em;\n  font-variant-numeric:tabular-nums;\n}\n.tw-oob-t1-en tbody th,.tw-oob-t1-en tbody td{border-top:1px solid var(--color-border-tertiary)}\n.tw-oob-t1-en tbody tr:first-child th,.tw-oob-t1-en tbody tr:first-child td{border-top:0}\n\/* Highlight base case *\/\n.tw-oob-t1-en tbody td.is-base{background:var(--color-surface-blue-subtle);font-weight:600}\n\/* Result row: break-even *\/\n.tw-oob-t1-en tbody tr.is-result th,.tw-oob-t1-en tbody tr.is-result td{\n  font-weight:600;border-top:1px solid var(--color-border-primary);\n}\n.tw-oob-t1-en tbody tr.is-result td{background:var(--color-bg-secondary)}\n.tw-oob-t1-en tbody tr.is-result td.is-base{background:var(--color-surface-blue-subtle)}\n\n\/* Mobile (Elementor breakpoint): cards instead of table *\/\n@media (max-width:767px){\n  .tw-oob-t1-en .tw-oob-t1-en__scroll{overflow:visible;border:0;border-radius:0;background:transparent}\n  .tw-oob-t1-en table,.tw-oob-t1-en tbody,.tw-oob-t1-en tr,.tw-oob-t1-en th,.tw-oob-t1-en td{display:block;width:100%;box-sizing:border-box}\n  .tw-oob-t1-en thead{position:absolute;width:1px;height:1px;overflow:hidden;clip:rect(0 0 0 0)}\n  .tw-oob-t1-en tbody tr{\n    margin:0 0 var(--space-12);\n    border:1px solid var(--color-border-tertiary);\n    border-radius:var(--radius-12);\n    overflow:hidden;background:var(--color-surface);\n  }\n  .tw-oob-t1-en tbody th,\n  .tw-oob-t1-en tbody tr.is-result th{width:100%;border-right:0;border-top:0}\n  .tw-oob-t1-en tbody tr td,\n  .tw-oob-t1-en tbody tr.is-result td{\n    display:flex;justify-content:space-between;align-items:baseline;gap:var(--space-16);\n    padding:var(--space-8) var(--space-16);\n    border-top:1px solid var(--color-border-tertiary);\n    text-align:right;\n  }\n  .tw-oob-t1-en tbody td::before{\n    content:attr(data-label);\n    text-align:left;white-space:normal;\n    color:var(--color-text-secondary);\n    font-size:15px;line-height:20px;font-weight:400;\n  }\n}\n<\/style>\n\n<div class=\"tw-oob-t1-en\" lang=\"en\">\n  <div class=\"tw-oob-t1-en__scroll\">\n    <table>\n      <caption>Model calculation: cost of a communication outage for 100 employees compared with the Teamwire licence<\/caption>\n      <thead>\n        <tr>\n          <th scope=\"col\">Model calculation: 100&nbsp;employees<\/th>\n          <th scope=\"col\">30% blocked<\/th>\n          <th scope=\"col\">50% blocked (base case)<\/th>\n          <th scope=\"col\">60% blocked<\/th>\n        <\/tr>\n      <\/thead>\n      <tbody>\n        <tr>\n          <th scope=\"row\">Direct cost per hour<span>100 \u00d7 \u20ac45.00 \u00d7 factor<\/span><\/th>\n          <td data-label=\"30% blocked\">\u20ac1,350<\/td>\n          <td data-label=\"50% blocked (base case)\" class=\"is-base\">\u20ac2,250<\/td>\n          <td data-label=\"60% blocked\">\u20ac2,700<\/td>\n        <\/tr>\n        <tr>\n          <th scope=\"row\">One working day<span>8 hours<\/span><\/th>\n          <td data-label=\"30% blocked\">\u20ac10,800<\/td>\n          <td data-label=\"50% blocked (base case)\" class=\"is-base\">\u20ac18,000<\/td>\n          <td data-label=\"60% blocked\">\u20ac21,600<\/td>\n        <\/tr>\n        <tr>\n          <th scope=\"row\">Teamwire licence per year, net<span>100 \u00d7 \u20ac3.45 \u00d7 12<\/span><\/th>\n          <td data-label=\"30% blocked\">\u20ac4,140<\/td>\n          <td data-label=\"50% blocked (base case)\" class=\"is-base\">\u20ac4,140<\/td>\n          <td data-label=\"60% blocked\">\u20ac4,140<\/td>\n        <\/tr>\n        <tr class=\"is-result\">\n          <th scope=\"row\">Break-even<span>Outage time per year<\/span><\/th>\n          <td data-label=\"30% blocked\">approx. 184&nbsp;min<\/td>\n          <td data-label=\"50% blocked (base case)\" class=\"is-base\">approx. 110&nbsp;min<\/td>\n          <td data-label=\"60% blocked\">approx. 92&nbsp;min<\/td>\n        <\/tr>\n      <\/tbody>\n    <\/table>\n  <\/div>\n<\/div>\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-a78d243 e-flex e-con-boxed e-con e-parent\" data-id=\"a78d243\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-9228b2e elementor-widget elementor-widget-text-editor\" data-id=\"9228b2e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p><em>Model assumptions: Labour costs from Destatis 2025 (overall economy, excluding public administration); \u2018blockage factor\u2019 used as an assumption; break-even based on the assumption that the backup channel largely offsets the loss in productivity. If it only offsets half of the loss, the break-even time doubles \u2013 to around 3.7 hours per year in the base case. All Teamwire prices are net, plus VAT. Organisations unable to claim input VAT, such as many local authorities, government departments and hospitals, are quoted the gross amount of \u20ac4,926.60; the break-even time then rises to around 131 minutes in the base case, and to around 142 minutes in the healthcare sector.<\/em><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-f3758ad e-flex e-con-boxed e-con e-parent\" data-id=\"f3758ad\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-d017b09 elementor-widget elementor-widget-li-spacer\" data-id=\"d017b09\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"li-spacer.default\">\n\t\t\t\t\t<div class=\"li-elementor-widget li-elementor-widget--li-spacer\">\n    <div class=\"li-spacer-inner\"><\/div>\n<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4cc62ce elementor-widget elementor-widget-text-editor\" data-id=\"4cc62ce\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p>This table only includes direct costs: paid but lost working time. It does not include indirect costs, which in practice often have a greater impact: delayed orders and decisions, overtime to catch up, contractual penalties, customer churn and damage to reputation.<\/p><p>The study \u2018The Hidden Costs of Downtime\u2019 by Splunk and Oxford Economics puts the downtime costs for Global 2000 companies at US$400 billion per year \u2013 around 9 per cent of their profits \u2013 with hidden costs such as brand damage and delayed product launches accounting for a significant proportion.<\/p><p>According to the Uptime Institute\u2019s Annual Outage Analysis 2026, published on 13 May 2026, 57 per cent of respondents to the 2025 annual survey stated that their most recent major outage had cost more than US$100,000. For the second year running, one in five respondents reported costs exceeding one million.<\/p><h2>Sector-specific analysis: critical infrastructure, public authorities, healthcare<\/h2><p>Labour costs vary considerably from sector to sector \u2013 and so does the break-even point. Destatis reports the following hourly figures, amongst others, for 2025:<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-d8de12d e-flex e-con-boxed e-con e-parent\" data-id=\"d8de12d\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8c1d0d1 elementor-widget elementor-widget-li-spacer\" data-id=\"8c1d0d1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"li-spacer.default\">\n\t\t\t\t\t<div class=\"li-elementor-widget li-elementor-widget--li-spacer\">\n    <div class=\"li-spacer-inner\"><\/div>\n<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2ef77ae elementor-widget elementor-widget-html\" data-id=\"2ef77ae\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"html.default\">\n\t\t\t\t\t<!-- Teamwire Blog (EN) | Table 2: Sector comparison, break-even | for the Elementor \"HTML\" widget -->\n<style>\n.tw-oob-t2-en{\n  \/* Teamwire design tokens (light) *\/\n  --color-text:#0D0D0D;\n  --color-text-secondary:#575755;\n  --color-text-inverse:#FDFCFB;\n  --color-fill-brand:#0061FE;\n  --color-surface:#FDFCFB;\n  --color-surface-blue-subtle:#E2EDFF;\n  --color-bg-secondary:#F7F6F3;\n  --color-border-tertiary:#E3E2DD;\n  --color-border-primary:rgba(0,0,0,.15);\n  --color-border-inverse:#FDFCFB;\n  --space-4:4px;--space-8:8px;--space-12:12px;--space-16:16px;--space-24:24px;\n  --radius-12:12px;\n  margin:0 0 var(--space-24);\n  font-family:\"Host Grotesk\",system-ui,sans-serif;\n  color:var(--color-text);\n}\n.tw-oob-t2-en .tw-oob-t2-en__scroll{\n  overflow-x:auto;\n  border:1px solid var(--color-border-tertiary);\n  border-radius:var(--radius-12);\n  background:var(--color-surface);\n}\n.tw-oob-t2-en table{\n  width:100%;margin:0;border:0;\n  table-layout:fixed;\n  border-collapse:separate;border-spacing:0;\n  background:transparent;\n}\n.tw-oob-t2-en caption{\n  position:absolute;width:1px;height:1px;overflow:hidden;clip:rect(0 0 0 0);white-space:nowrap;\n}\n.tw-oob-t2-en th,.tw-oob-t2-en td{\n  margin:0;border:0;background:transparent;\n  padding:var(--space-12) var(--space-16);\n  vertical-align:middle;\n}\n\/* Header row: Host\/body_3-semibold, centred *\/\n.tw-oob-t2-en thead th{\n  background:var(--color-fill-brand);\n  color:var(--color-text-inverse);\n  font-size:15px;line-height:20px;font-weight:600;letter-spacing:.01em;\n  text-align:center;\n}\n\/* Column 1: own background and divider; all columns equal width (25%) *\/\n.tw-oob-t2-en thead th:first-child{\n  width:25%;\n  border-right:1px solid var(--color-border-inverse);\n}\n.tw-oob-t2-en tbody th{\n  width:25%;\n  text-align:left;\n  background:var(--color-bg-secondary);\n  border-right:1px solid var(--color-border-primary);\n  font-size:15px;line-height:20px;font-weight:600;letter-spacing:.01em; \/* Host\/body_3-semibold *\/\n}\n.tw-oob-t2-en tbody th span{\n  display:block;margin-top:var(--space-4);\n  color:var(--color-text-secondary);\n  font-size:13px;line-height:18px;font-weight:400;letter-spacing:.02em; \/* Host\/small-regular *\/\n}\n\/* Values: Host\/body_2-regular, centred under the column headers *\/\n.tw-oob-t2-en tbody td{\n  text-align:center;white-space:nowrap;\n  font-size:16px;line-height:21px;font-weight:400;letter-spacing:.01em;\n  font-variant-numeric:tabular-nums;\n}\n.tw-oob-t2-en tbody th,.tw-oob-t2-en tbody td{border-top:1px solid var(--color-border-tertiary)}\n.tw-oob-t2-en tbody tr:first-child th,.tw-oob-t2-en tbody tr:first-child td{border-top:0}\n\/* Highlight break-even column *\/\n.tw-oob-t2-en tbody td.is-base{background:var(--color-surface-blue-subtle);font-weight:600}\n\/* Mobile (Elementor breakpoint): cards instead of table *\/\n@media (max-width:767px){\n  .tw-oob-t2-en .tw-oob-t2-en__scroll{overflow:visible;border:0;border-radius:0;background:transparent}\n  .tw-oob-t2-en table,.tw-oob-t2-en tbody,.tw-oob-t2-en tr,.tw-oob-t2-en th,.tw-oob-t2-en td{display:block;width:100%;box-sizing:border-box}\n  .tw-oob-t2-en thead{position:absolute;width:1px;height:1px;overflow:hidden;clip:rect(0 0 0 0)}\n  .tw-oob-t2-en tbody tr{\n    margin:0 0 var(--space-12);\n    border:1px solid var(--color-border-tertiary);\n    border-radius:var(--radius-12);\n    overflow:hidden;background:var(--color-surface);\n  }\n  .tw-oob-t2-en tbody th {width:100%;border-right:0;border-top:0}\n  .tw-oob-t2-en tbody tr td {\n    display:flex;justify-content:space-between;align-items:baseline;gap:var(--space-16);\n    padding:var(--space-8) var(--space-16);\n    border-top:1px solid var(--color-border-tertiary);\n    text-align:right;\n  }\n  .tw-oob-t2-en tbody td::before{\n    content:attr(data-label);\n    text-align:left;white-space:normal;\n    color:var(--color-text-secondary);\n    font-size:15px;line-height:20px;font-weight:400;\n  }\n}\n<\/style>\n\n<div class=\"tw-oob-t2-en\" lang=\"en\">\n  <div class=\"tw-oob-t2-en__scroll\">\n    <table>\n      <caption>Labour costs per hour by sector (Destatis 2025), loss per outage hour and break-even of the Teamwire licence<\/caption>\n      <thead>\n        <tr>\n          <th scope=\"col\">Sector (Destatis&nbsp;2025)<\/th>\n          <th scope=\"col\">Labour cost\/hour<\/th>\n          <th scope=\"col\">Loss\/hour for 100&nbsp;employees (50%)<\/th>\n          <th scope=\"col\">Teamwire break-even (\u20ac4,140&nbsp;net)<\/th>\n        <\/tr>\n      <\/thead>\n      <tbody>\n        <tr>\n          <th scope=\"row\">Energy supply<\/th>\n          <td data-label=\"Labour cost\/hour\">\u20ac65.80<\/td>\n          <td data-label=\"Loss\/hour for 100 employees (50%)\">\u20ac3,290<\/td>\n          <td data-label=\"Teamwire break-even (\u20ac4,140 net)\" class=\"is-base\">approx. 75&nbsp;min<\/td>\n        <\/tr>\n        <tr>\n          <th scope=\"row\">Financial and insurance services<\/th>\n          <td data-label=\"Labour cost\/hour\">\u20ac69.70<\/td>\n          <td data-label=\"Loss\/hour for 100 employees (50%)\">\u20ac3,485<\/td>\n          <td data-label=\"Teamwire break-even (\u20ac4,140 net)\" class=\"is-base\">approx. 71&nbsp;min<\/td>\n        <\/tr>\n        <tr>\n          <th scope=\"row\">Total economy<\/th>\n          <td data-label=\"Labour cost\/hour\">\u20ac45.00<\/td>\n          <td data-label=\"Loss\/hour for 100 employees (50%)\">\u20ac2,250<\/td>\n          <td data-label=\"Teamwire break-even (\u20ac4,140 net)\" class=\"is-base\">approx. 110&nbsp;min<\/td>\n        <\/tr>\n        <tr>\n          <th scope=\"row\">Water supply\/<wbr>waste management<\/th>\n          <td data-label=\"Labour cost\/hour\">\u20ac42.00<\/td>\n          <td data-label=\"Loss\/hour for 100 employees (50%)\">\u20ac2,100<\/td>\n          <td data-label=\"Teamwire break-even (\u20ac4,140 net)\" class=\"is-base\">approx. 118&nbsp;min<\/td>\n        <\/tr>\n        <tr>\n          <th scope=\"row\">Health and social work<\/th>\n          <td data-label=\"Labour cost\/hour\">\u20ac41.70<\/td>\n          <td data-label=\"Loss\/hour for 100 employees (50%)\">\u20ac2,085<\/td>\n          <td data-label=\"Teamwire break-even (\u20ac4,140 net)\" class=\"is-base\">approx. 119&nbsp;min<\/td>\n        <\/tr>\n      <\/tbody>\n    <\/table>\n  <\/div>\n<\/div>\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-390d614 e-flex e-con-boxed e-con e-parent\" data-id=\"390d614\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-d05d537 elementor-widget elementor-widget-text-editor\" data-id=\"d05d537\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<h3>Energy suppliers and municipal utilities<\/h3><p>They have the highest labour costs of all the critical infrastructure sectors \u2013 and the greatest associated risk. If, in the event of a grid disruption, coordination between the control centre, fault-clearing teams, and the crisis management team breaks down, the issue is no longer one of productivity but of security of supply.<\/p><p>According to <em>heise<\/em>, the final report published on 20 March 2026 by the ENTSO-E expert panel on the Iberian blackout of 28 April 2025 \u2013 which affected around 60 million people \u2013 points to communication problems between several distribution system operators and large grid users during the restoration process, which took up to 16 hours in some regions.<\/p><h3>Local authorities and government bodies<\/h3><p>Public authorities know from their own experience how long an IT outage can last. In 2021, the district of Anhalt-Bitterfeld became the first German local authority to declare a state of emergency following a cyberattack. The attack lasted 207 days; at times, nearly a thousand administrative staff were only able to work by telephone or fax, and according to the district, the costs amounted to around 2.5 million euros.<\/p><p>The <a class=\"wpil_keyword_link\" href=\"https:\/\/teamwire.eu\/en\/lexicon\/ransomware\/\"   title=\"ransomware\" data-wpil-keyword-link=\"linked\"  data-wpil-monitor-id=\"1258\">ransomware<\/a> attack on the local authority IT service provider S\u00fcdwestfalen-IT in October 2023 paralysed the systems of more than 70 local authorities; telephone lines were down, and it took around eleven months to return to normal operations \u2013 incurring additional costs of at least 2.8 million euros for the service provider.<\/p><p>For the police and the public safety sector, the cost is calculated differently anyway: here, the damage is measured in terms of response time.<\/p><h3>Hospitals and other healthcare facilities<\/h3><p>The healthcare sector feels the immediate impact of communication failures on patient care. Following a ransomware attack in September 2020, D\u00fcsseldorf University Hospital was unable to provide emergency care for 13 days.<\/p><p>The KHO hospitals in Bielefeld, Herford and Rheda-Wiedenbr\u00fcck were also forced to suspend services following an attack on Christmas Eve 2023 and only gradually resumed emergency care after around twelve days.<\/p><p>According to an analysis by the insurer Parametrix dated 24 July 2024, of the estimated US$5.4 billion in direct losses incurred by Fortune 500 companies (excluding Microsoft) during the CrowdStrike outage in July 2024, around US$1.94 billion was attributable to the healthcare sector and US$1.15 billion to banks. Only a total of US$540 million to US$1.08 billion was insured, representing 10 to 20 per cent of the total loss.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-367fc98 e-flex e-con-boxed e-con e-parent\" data-id=\"367fc98\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-b6b396b elementor-widget elementor-widget-li-spacer\" data-id=\"b6b396b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"li-spacer.default\">\n\t\t\t\t\t<div class=\"li-elementor-widget li-elementor-widget--li-spacer\">\n    <div class=\"li-spacer-inner\"><\/div>\n<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-24f7fa4 elementor-widget elementor-widget-shortcode\" data-id=\"24f7fa4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"shortcode.default\">\n\t\t\t\t\t\t\t<div class=\"elementor-shortcode\"><div class=\"hs-cta-embed hs-cta-simple-placeholder hs-cta-embed-408852876504\"\n  style=\"max-width:100%; max-height:100%; width:672px;height:268.359375px\" data-hubspot-wrapper-cta-id=\"408852876504\">\n  <a href=\"https:\/\/cta-eu1.hubspot.com\/web-interactives\/public\/v1\/track\/redirect?encryptedPayload=AVxigLIE%2Bl7O%2BreBL0fPuSceqsmap9ryvnku9DDzI77q4ViYnyzy5%2B4ULJzGI2UsngSHQrEIMsnYYhNSPDcD64P9bt1YDbcNtexqjl4WOX24cLSjKahUdD3QtphXNcDrYS4Egb1xhVxwMryt9ncVF7DGtsLJoa8JH%2FEa9DAuixLZKJKJT31m1e6V1944BdFoneFiuRUITVjF1T3fJtBKlFklCnjHBIqc4jrdoLfAKPsJD5ebW8wEIpTmXrsFXUtT0k%2B8Ow%3D%3D&amp;webInteractiveContentId=408852876504&amp;portalId=143616833\" target=\"_blank\" rel=\"noopener\" crossorigin=\"anonymous\">\n    <img decoding=\"async\" alt=\"&lt;p&gt;&lt;span style=&quot;font-size: 18px;&quot;&gt;Read full story&lt;\/span&gt;&lt;\/p&gt;\" loading=\"lazy\" src=\"https:\/\/hubspot-no-cache-eu1-prod.s3.amazonaws.com\/cta\/default\/143616833\/interactive-408852876504.png\" style=\"height: 100%; width: 100%; object-fit: fill\"\n      onerror=\"this.style.display='none'\" \/>\n  <\/a>\n<\/div>\n<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-8749556 e-flex e-con-boxed e-con e-parent\" data-id=\"8749556\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-2e674aa elementor-widget elementor-widget-text-editor\" data-id=\"2e674aa\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<h2>Costs of out-of-band communication versus expected damage: the ALE logic<\/h2><p>Risk managers assess such investments using the Annualised Loss Expectancy: ALE = SLE \u00d7 ARO, i.e. expected single loss multiplied by the expected frequency per year. According to the ISACA Journal, the ALE can be used to justify the costs of countermeasures; the rule of thumb is that a measure is cost-effective if its annual costs are lower than the reduction in the ALE.<\/p><p>A calculation example (model assumption): Assume two relevant communication outages per year, each lasting four hours \u2013 for example, a cloud outage and an internal disruption. In the base case, this amounts to 8 hours \u00d7 \u20ac2,250 = \u20ac18,000 ALE, which is more than four times the Teamwire annual licence fee of \u20ac4,140 net. A single day of downtime, such as that in November 2026, is enough to reach this figure. And this scenario is not hypothetical: the November outage alone lasted around 36 hours.<\/p><p>For larger organisations, the calculation scales linearly: with 500 users, the Standard licence costs \u20ac20,700 net per year; the loss in the base case would be \u20ac11,250 per hour \u2013 the break-even point remains at around 110 minutes. For 501 users or more, the Professional package applies, with prices available on request; for 1,000 employees, a day\u2019s downtime in the base case would amount to around \u20ac180,000.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-9315a40 e-flex e-con-boxed e-con e-parent\" data-id=\"9315a40\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-68e3af7 elementor-widget elementor-widget-text-editor\" data-id=\"68e3af7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<h2>Regulatory obligations as an additional cost factor<\/h2><p>Since 6 December 2025, the NIS 2 Implementation Act has been in force in Germany without a transition period. Section 30(2) of the BSIG requires\u00a0important and particularly important entities to implement, amongst other things, measures for \u2018maintaining operations\u2019 and \u2018crisis management\u2019 (No. 3) as well as \u201csecure voice, video and text communication and, where appropriate, secure emergency communication systems within the organisation\u201d (No. 10).<\/p><p>The Act does not prescribe a specific messaging service \u2013 but it does require a documented, proportionate solution. Under Section 38 of the BSIG, senior management must implement these measures and monitor their implementation, and is liable to the organisation for any damage caused through negligence. Section 65 of the BSIG provides for fines of up to 10 million euros or 2 per cent of global annual turnover for particularly important organisations, and up to 7 million euros or 1.4 per cent for important organisations.<\/p><p>The BSI Standard 200-4 on <a class=\"wpil_keyword_link\" title=\"Business Continuity Management\" href=\"https:\/\/teamwire.eu\/en\/lexicon\/business-continuity-management\/\" data-wpil-keyword-link=\"linked\" data-wpil-monitor-id=\"1252\">Business Continuity Management<\/a> is even more specific: it stipulates that organisations must plan for alternative communication and alerting channels \u2013 in the event that the regular technology itself is affected by the incident.<\/p><p>In the financial sector, Article 11 of <a class=\"wpil_keyword_link\" title=\"DORA\" href=\"https:\/\/teamwire.eu\/en\/blog\/dora-digital-operational-resilience-act-what-banks-insurers-and-it-service-providers-need-to-know\/\" data-wpil-keyword-link=\"linked\" data-wpil-monitor-id=\"1257\">DORA<\/a> requires communication and crisis management measures as well as tests of crisis communication plans, whilst Article 14 mandates communication plans and strategies. ISO\/IEC 27001:2022 addresses this issue via controls A.5.29 (Information security in the event of disruptions), A.5.30 (ICT readiness for business continuity) and A.8.14 (redundancy).<\/p><p>The KRITIS Framework Act has been in force since 17 March 2026 and obliges operators of critical infrastructure to implement resilience measures in order to be able to respond effectively to disruptions.<\/p><p>Added to this is a principle familiar to every incident responder: in the event of a cyber attack, one\u2019s own infrastructure is potentially compromised. Anyone who then coordinates the crisis management team via the affected email system may well be laying out the countermeasures for the attackers to follow.<\/p><p>This is precisely why out-of-band communication exists: a channel that is technically and organisationally independent of the primary infrastructure.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-9319fed e-flex e-con-boxed e-con e-parent\" data-id=\"9319fed\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8c65f8d elementor-widget elementor-widget-li-spacer\" data-id=\"8c65f8d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"li-spacer.default\">\n\t\t\t\t\t<div class=\"li-elementor-widget li-elementor-widget--li-spacer\">\n    <div class=\"li-spacer-inner\"><\/div>\n<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6ab68d8 elementor-widget elementor-widget-shortcode\" data-id=\"6ab68d8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"shortcode.default\">\n\t\t\t\t\t\t\t<div class=\"elementor-shortcode\"><div class=\"hs-cta-embed hs-cta-simple-placeholder hs-cta-embed-110290171382\"\n  style=\"max-width:100%; max-height:100%; width:672px;height:327.734375px\" data-hubspot-wrapper-cta-id=\"110290171382\">\n  <a href=\"https:\/\/cta-eu1.hubspot.com\/web-interactives\/public\/v1\/track\/redirect?encryptedPayload=AVxigLIv51IYQkMojWVzdEg30doJYyw84x5LC%2FiasSWGDrnvX9jVkuKovMnqcZLrJ56tyjHJU1fXkwGrai8Hl3mAKncHeYy7t1VBFFFhV92hDXPO%2BzvA2y%2BmwcZUcOuB301a713NBOK6XTzVDUHmtdt%2BJwMwpKAVkwqB2QgcBbXePgWKPktUES3FJKzR23Ed%2BErRg7AXogQdSupgcJsPsWZ5DBpj4WCTVriJdUgTDGX2wg%3D%3D&amp;webInteractiveContentId=110290171382&amp;portalId=143616833\" target=\"_blank\" rel=\"noopener\" crossorigin=\"anonymous\">\n    <img decoding=\"async\" alt=\"Download\" loading=\"lazy\" src=\"https:\/\/hubspot-no-cache-eu1-prod.s3.amazonaws.com\/cta\/default\/143616833\/interactive-110290171382.png\" style=\"height: 100%; width: 100%; object-fit: fill\"\n      onerror=\"this.style.display='none'\" \/>\n  <\/a>\n<\/div>\n<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-2606ffd e-flex e-con-boxed e-con e-parent\" data-id=\"2606ffd\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-6b635b0 elementor-widget elementor-widget-text-editor\" data-id=\"6b635b0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<h2>Why the calculation actually underestimates the benefits<\/h2><p>The model calculation only considers the emergency scenario. The second-order effects of a missing backup channel do not feature in it at all. If, for example, Microsoft Teams goes down, staff will still communicate \u2013 just via private messaging apps. Whilst this keeps operations running in a makeshift manner, it creates <a class=\"wpil_keyword_link\" href=\"https:\/\/teamwire.eu\/en\/blog\/shadow-it\/\" title=\"shadow IT\" data-wpil-keyword-link=\"linked\" data-wpil-monitor-id=\"1254\">shadow IT<\/a>: personal data, patient photographs or situation reports end up on private devices with providers beyond your control. Breaches of the GDPR can be penalised under Article 83 with fines of up to 20 million euros or 4 per cent of global annual turnover.<\/p><p>An out-of-band channel used in day-to-day operations provides a permanent solution to this problem: as a work messenger for mobile staff without a fixed office desk, as a replacement for WhatsApp groups, and as an alerting tool for on-call teams and crisis management teams.<\/p><p>Added to this is the strategic dimension: dependence on a single US cloud provider poses a concentration risk \u2013 both technically, as November 2026 demonstrated, and in regulatory terms, because public authorities, critical infrastructure operators, and hospitals must meet strict requirements regarding data storage, certification, and auditability.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-96286b3 e-flex e-con-boxed e-con e-parent\" data-id=\"96286b3\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a15fd24 elementor-widget elementor-widget-text-editor\" data-id=\"a15fd24\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<h2>Requirements for a suitable out-of-band channel<\/h2><p>To ensure that a backup channel is effective in an emergency, it should meet five criteria, which are listed below using Teamwire as an example:<\/p><h3>1. Independent infrastructure<\/h3><p>No shared identity, no shared data centre, no shared dependency with the primary system.<\/p><h3>2. Independent hosting<\/h3><p>Teamwire operates its cloud in Germany; data is stored exclusively on German servers. Alternatively, <a class=\"wpil_keyword_link\" title=\"private cloud\" href=\"https:\/\/teamwire.eu\/en\/lexicon\/private-cloud\/\" data-wpil-keyword-link=\"linked\" data-wpil-monitor-id=\"1253\">private cloud<\/a> and on-premises deployment are also possible.<\/p><h3>3. Verifiable security<\/h3><p>Teamwire is based on a zero-trust approach and is ISO 27001-certified. The German cloud operated by its hosting partner holds a BSI C5 certificate. Audit-proof archiving with audit logs should also be included in the licence.<\/p><h3>4. Operational functions<\/h3><p>Alerting with acknowledgement, live locations, map and photo editing, push-to-talk, and <a class=\"wpil_keyword_link\" title=\"augmented reality\" href=\"https:\/\/teamwire.eu\/en\/blog\/teamwire-augmented-reality\/\" data-wpil-keyword-link=\"linked\" data-wpil-monitor-id=\"1255\">augmented reality<\/a>.<\/p><h3>5. Immediate operational readiness<\/h3><p>A communication channel that nobody knows about is of no use in a crisis \u2013 which is why it should be used in everyday life and practised regularly.<\/p><p>Be honest about its limitations: even an out-of-band messenger needs power and a network connection. For scenarios such as a widespread power cut, emergency power, satellite communications or radio should form part of a multi-tiered plan. For the far more common scenarios \u2013 cloud outages, ransomware, telephone system failures \u2013 an independent, self-contained messenger is the most cost-effective solution.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-8c66658 e-flex e-con-boxed e-con e-parent\" data-id=\"8c66658\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-5c5f833 elementor-widget elementor-widget-text-editor\" data-id=\"5c5f833\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<h2>Conclusion: \u20ac4,140 versus a single day\u2019s absence<\/h2><p>The figures speak for themselves. For an organisation with 100 employees, the cost of out-of-band communication using Teamwire is \u20ac4,140 net per year. A single working day without Teams and Outlook costs around \u20ac18,000 in our conservative model calculation \u2013 excluding follow-on costs, the risk of fines, and reputational damage. The break-even point is less than two hours of downtime per year.<\/p><p>Check the figures using your own numbers: try Teamwire free of charge for 14 days with no credit card required, or book a live demo where we can walk through your out-of-band scenario together.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-8c5edd3 e-flex e-con-boxed e-con e-parent\" data-id=\"8c5edd3\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-f701f2b elementor-widget elementor-widget-li-spacer\" data-id=\"f701f2b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"li-spacer.default\">\n\t\t\t\t\t<div class=\"li-elementor-widget li-elementor-widget--li-spacer\">\n    <div class=\"li-spacer-inner\"><\/div>\n<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cdd8b93 elementor-widget elementor-widget-shortcode\" data-id=\"cdd8b93\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"shortcode.default\">\n\t\t\t\t\t\t\t<div class=\"elementor-shortcode\"><div class=\"hs-cta-embed hs-cta-simple-placeholder hs-cta-embed-99710995691\"\n  style=\"max-width:100%; max-height:100%; width:700px;height:169.39453125px\" data-hubspot-wrapper-cta-id=\"99710995691\">\n  <a href=\"https:\/\/cta-eu1.hubspot.com\/web-interactives\/public\/v1\/track\/redirect?encryptedPayload=AVxigLINDeeC794q%2FUJqlgpdQT7675UPWOYT4sFJoRymen0KBIKDMRBbqXwf3fdi9O0L7DJ6EwROkn2KlCSKKHzt5DLkNSupRFZ4bYSCjMzy9QmTlM4ZdDIPFd%2Bp6Io9PCI3cpucqvAeqDLGfjg2kjuJyZa%2FVGSAQmVZxpKK9DLXt7ikSD20HpLyMxNvCSwFlAm%2Bavbvx2FeNMynUD6AFw%3D%3D&amp;webInteractiveContentId=99710995691&amp;portalId=143616833\" target=\"_blank\" rel=\"noopener\" crossorigin=\"anonymous\">\n    <img decoding=\"async\" alt=\"Book demo\" loading=\"lazy\" src=\"https:\/\/hubspot-no-cache-eu1-prod.s3.amazonaws.com\/cta\/default\/143616833\/interactive-99710995691.png\" style=\"height: 100%; width: 100%; object-fit: fill\"\n      onerror=\"this.style.display='none'\" \/>\n  <\/a>\n<\/div>\n<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>If Teams and Outlook go down, it\u2019s not just chat that grinds to a halt, but also paid working time, decision-making and, in an emergency, crisis coordination. We use official figures to calculate what an hour of communication downtime really costs, and show why the costs of out-of-band communication pay for themselves after just under two hours of downtime per year.<\/p>\n","protected":false},"author":19,"featured_media":21064,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,67,68,69,66],"tags":[],"class_list":["post-21061","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-allgemein","category-business-continuity","category-crisis-communication","category-cybersecurity","category-security"],"acf":[],"_links":{"self":[{"href":"https:\/\/teamwire.eu\/en\/wp-json\/wp\/v2\/posts\/21061","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teamwire.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teamwire.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teamwire.eu\/en\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/teamwire.eu\/en\/wp-json\/wp\/v2\/comments?post=21061"}],"version-history":[{"count":7,"href":"https:\/\/teamwire.eu\/en\/wp-json\/wp\/v2\/posts\/21061\/revisions"}],"predecessor-version":[{"id":21114,"href":"https:\/\/teamwire.eu\/en\/wp-json\/wp\/v2\/posts\/21061\/revisions\/21114"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teamwire.eu\/en\/wp-json\/wp\/v2\/media\/21064"}],"wp:attachment":[{"href":"https:\/\/teamwire.eu\/en\/wp-json\/wp\/v2\/media?parent=21061"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teamwire.eu\/en\/wp-json\/wp\/v2\/categories?post=21061"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teamwire.eu\/en\/wp-json\/wp\/v2\/tags?post=21061"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}